BUILDING METHOD OF BUILDING BY FRAMEWORK BUILDING CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To provide a building method capable of further quickly and safely completing erection by a small number of workers by improving the building method for a building built by a framework construction method. SOLUTION: A foundation 2 is fixed on the upper surface of a continuous f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: NOZAKI ISAMU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a building method capable of further quickly and safely completing erection by a small number of workers by improving the building method for a building built by a framework construction method. SOLUTION: A foundation 2 is fixed on the upper surface of a continuous footing 1 by using an anchor bolt (a), a first floor stage 4 is formed on the surface surrounded by the foundation 2 (b), a first floor peripheral wall framing 7 is formed by combining a column material with a horizontal member on the first floor stage 4 (c), the first floor peripheral wall framing 7 is erected on the foundation 2 (d), a pipe column 21 of the erected first floor peripheral wall framing 7 and the anchor bolt are fixed to form a second floor stage 9 on the surface surrounded by a highest horizontal member of the first floor peripheral wall framing 7 (e), a second floor peripheral wall framing 11 is formed by combining the column material and the horizontal member on the second floor stage 9 (f), the second floor peripheral wall framing 11 is erected on the highest horizontal member of the first floor peripheral wall framing 7 (g), the erected second floor peripheral wall framing 11 and the highest horizontal member of the first floor peripheral wall framing 7 are fixed to form a roof frame 13 (h). COPYRIGHT: (C)2004,JPO&NCIPI