SUPPORT METHOD AND DEVICE FOR CLIMBING TOWER CRANE
PROBLEM TO BE SOLVED: To execute the climbing of the swiveling body soon after the concrete skeleton at the highest floor is placed even the construction building is made of reinforced concrete (RC) when the floor climbing method is adopted, and prevent a lowering of workability even the floor climb...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To execute the climbing of the swiveling body soon after the concrete skeleton at the highest floor is placed even the construction building is made of reinforced concrete (RC) when the floor climbing method is adopted, and prevent a lowering of workability even the floor climbing method is adopted in the construction building made of reinforced concrete (RC). SOLUTION: A swiveling body receiving stand 9 is replaceably fixed on the predetermined floor of the skeleton 2 of the building intended to construct, the swivel body 3 of the climbing tower crane is placed on the swivel body receiving stand 9 at the time of climbing, a mast 5 is climbed in this state and the swivel body 3 is climbed along the mast 5 afterward. COPYRIGHT: (C)2004,JPO |
---|