FOUNDATION PILE STRUCTURE IN LIQUEFACTION GROUND
PROBLEM TO BE SOLVED: To constitute a foundation pile structure so as to retain the structure even in a liquefaction ground in an earthquake. SOLUTION: A solidified layer 2 of soil cement is formed at least in the periphery of the foundation pile 1 in a liquefaction layer. The rigidity of the solidi...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To constitute a foundation pile structure so as to retain the structure even in a liquefaction ground in an earthquake. SOLUTION: A solidified layer 2 of soil cement is formed at least in the periphery of the foundation pile 1 in a liquefaction layer. The rigidity of the solidified layer 2 is preferably at least 0.2 times as much as the rigidity of the foundation pile 1 and the outer diameter of the solidified layer 2 is preferably 1.4-2.7 times as much as the diameter of the foundation pile 1. COPYRIGHT: (C)2004,JPO |
---|