BUILDING PRODUCTION INFORMATION INTEGRATION SYSTEM

PROBLEM TO BE SOLVED: To enhance the integrated efficiency of a building production by enabling the improvement in quality of a draft to promote the following matching work with easiness and a shortened time, which leads to the shortening of the whole process, and using the data formed in an executi...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TANI YASUBUMI, TAKAGI MANABU, YASAKA FUMIKO, TAMAI HIROSHI, UENO SHIGEHIKO, TAKAHASHI TAKETOSHI, SANO YUKIO, TAKAGAKI TORU, UENAMI TETSURO, WAKASUGI KAZUO, TSUJIMOTO MINORU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To enhance the integrated efficiency of a building production by enabling the improvement in quality of a draft to promote the following matching work with easiness and a shortened time, which leads to the shortening of the whole process, and using the data formed in an execution design stage for the following estimation and construction stages. SOLUTION: A database separate from design CADs is externally constructed. The design CADs are based on different softwares according to the characteristics of building, structure and facility. The database constructs an integrated DB-CAD system as a construction corporation system in DB-CAD for sharing the data of a standard database. The information matched by three- dimensional superposing at the time of design is accumulated in the sharing database DB 4 of the integrated DB-CAD system, and further linked to commercially available skeleton drawing CAD or a reinforcement/steel-framed system to form construction information. COPYRIGHT: (C)2004,JPO