PROCESS MANAGEMENT PROGRAM AND PROCESS MANAGEMENT SYSTEM
PROBLEM TO BE SOLVED: To quickly and accurately create, confirm and alter the working processes of maintenance work for a plant such as a nuclear power plant according to safety regulations. SOLUTION: A program executing part 11 includes a mode plan setting part 111 for setting the planned start and...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | KETSUTOKU TAKAHIRO KAWAHATA HIROSHI OGAKI JUNJI |
description | PROBLEM TO BE SOLVED: To quickly and accurately create, confirm and alter the working processes of maintenance work for a plant such as a nuclear power plant according to safety regulations. SOLUTION: A program executing part 11 includes a mode plan setting part 111 for setting the planned start and end times of each mode upon receiving inputs from a user; a working plan setting part 113 for setting the planned work start and end times of each equipment upon receiving inputs from the user; and a plan determining part 121 which, according to the planned start and end times of each mode, the planned work start and end times, and equipment requirement information stored in an equipment requirement information storage part 135, determines whether or not a planned working period from the planned work start time to the planned work end time for each equipment constituting the plant overlaps with a period during which the equipment is required to be operable. COPYRIGHT: (C)2003,JPO |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JP2003185782A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JP2003185782A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JP2003185782A3</originalsourceid><addsrcrecordid>eNrjZLAICPJ3dg0OVvB19HN0d_V19QtRAAq5Bzn6Kjj6uShgkQ6ODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGBsaGFqbmFkaOxkQpAgDKACkj</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCESS MANAGEMENT PROGRAM AND PROCESS MANAGEMENT SYSTEM</title><source>esp@cenet</source><creator>KETSUTOKU TAKAHIRO ; KAWAHATA HIROSHI ; OGAKI JUNJI</creator><creatorcontrib>KETSUTOKU TAKAHIRO ; KAWAHATA HIROSHI ; OGAKI JUNJI</creatorcontrib><description>PROBLEM TO BE SOLVED: To quickly and accurately create, confirm and alter the working processes of maintenance work for a plant such as a nuclear power plant according to safety regulations. SOLUTION: A program executing part 11 includes a mode plan setting part 111 for setting the planned start and end times of each mode upon receiving inputs from a user; a working plan setting part 113 for setting the planned work start and end times of each equipment upon receiving inputs from the user; and a plan determining part 121 which, according to the planned start and end times of each mode, the planned work start and end times, and equipment requirement information stored in an equipment requirement information storage part 135, determines whether or not a planned working period from the planned work start time to the planned work end time for each equipment constituting the plant overlaps with a period during which the equipment is required to be operable. COPYRIGHT: (C)2003,JPO</description><edition>7</edition><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; NUCLEAR ENGINEERING ; NUCLEAR PHYSICS ; NUCLEAR REACTORS ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2003</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20030703&DB=EPODOC&CC=JP&NR=2003185782A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20030703&DB=EPODOC&CC=JP&NR=2003185782A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KETSUTOKU TAKAHIRO</creatorcontrib><creatorcontrib>KAWAHATA HIROSHI</creatorcontrib><creatorcontrib>OGAKI JUNJI</creatorcontrib><title>PROCESS MANAGEMENT PROGRAM AND PROCESS MANAGEMENT SYSTEM</title><description>PROBLEM TO BE SOLVED: To quickly and accurately create, confirm and alter the working processes of maintenance work for a plant such as a nuclear power plant according to safety regulations. SOLUTION: A program executing part 11 includes a mode plan setting part 111 for setting the planned start and end times of each mode upon receiving inputs from a user; a working plan setting part 113 for setting the planned work start and end times of each equipment upon receiving inputs from the user; and a plan determining part 121 which, according to the planned start and end times of each mode, the planned work start and end times, and equipment requirement information stored in an equipment requirement information storage part 135, determines whether or not a planned working period from the planned work start time to the planned work end time for each equipment constituting the plant overlaps with a period during which the equipment is required to be operable. COPYRIGHT: (C)2003,JPO</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>NUCLEAR ENGINEERING</subject><subject>NUCLEAR PHYSICS</subject><subject>NUCLEAR REACTORS</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2003</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLAICPJ3dg0OVvB19HN0d_V19QtRAAq5Bzn6Kjj6uShgkQ6ODA5x9eVhYE1LzClO5YXS3AxKbq4hzh66qQX58anFBYnJqXmpJfFeAUYGBsaGFqbmFkaOxkQpAgDKACkj</recordid><startdate>20030703</startdate><enddate>20030703</enddate><creator>KETSUTOKU TAKAHIRO</creator><creator>KAWAHATA HIROSHI</creator><creator>OGAKI JUNJI</creator><scope>EVB</scope></search><sort><creationdate>20030703</creationdate><title>PROCESS MANAGEMENT PROGRAM AND PROCESS MANAGEMENT SYSTEM</title><author>KETSUTOKU TAKAHIRO ; KAWAHATA HIROSHI ; OGAKI JUNJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JP2003185782A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2003</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>NUCLEAR ENGINEERING</topic><topic>NUCLEAR PHYSICS</topic><topic>NUCLEAR REACTORS</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>KETSUTOKU TAKAHIRO</creatorcontrib><creatorcontrib>KAWAHATA HIROSHI</creatorcontrib><creatorcontrib>OGAKI JUNJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KETSUTOKU TAKAHIRO</au><au>KAWAHATA HIROSHI</au><au>OGAKI JUNJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCESS MANAGEMENT PROGRAM AND PROCESS MANAGEMENT SYSTEM</title><date>2003-07-03</date><risdate>2003</risdate><abstract>PROBLEM TO BE SOLVED: To quickly and accurately create, confirm and alter the working processes of maintenance work for a plant such as a nuclear power plant according to safety regulations. SOLUTION: A program executing part 11 includes a mode plan setting part 111 for setting the planned start and end times of each mode upon receiving inputs from a user; a working plan setting part 113 for setting the planned work start and end times of each equipment upon receiving inputs from the user; and a plan determining part 121 which, according to the planned start and end times of each mode, the planned work start and end times, and equipment requirement information stored in an equipment requirement information storage part 135, determines whether or not a planned working period from the planned work start time to the planned work end time for each equipment constituting the plant overlaps with a period during which the equipment is required to be operable. COPYRIGHT: (C)2003,JPO</abstract><edition>7</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JP2003185782A |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES NUCLEAR ENGINEERING NUCLEAR PHYSICS NUCLEAR REACTORS PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | PROCESS MANAGEMENT PROGRAM AND PROCESS MANAGEMENT SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T02%3A38%3A42IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KETSUTOKU%20TAKAHIRO&rft.date=2003-07-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJP2003185782A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |