CONSTRUCTION METHOD OF ARTIFICIAL LOW WATER PERMEABLE LAYER
PROBLEM TO BE SOLVED: To provide a construction method of an artificial low water permeable layer adopted as a kind of underground water level lowering construction method at underground work of the large depth in the sand ground or the gravel ground having a high underground water level. SOLUTION:...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a construction method of an artificial low water permeable layer adopted as a kind of underground water level lowering construction method at underground work of the large depth in the sand ground or the gravel ground having a high underground water level. SOLUTION: A water filling well 3A is arranged in one of the construction object ground, and a pumping well 3B is arranged in the other. At least two aqueous solutions X and Y are simultaneously or separately injected into the ground from the water filling well. Water is pumped up from the pumping well, and a hydraulic gradient is formed in the ground, and an underground water flow is generated to promote permeation. Water permeability of the ground is reduced by generating a fine and water insoluble deposit in the ground by contacting and reacting the two aqueous solutions in the ground. COPYRIGHT: (C)2003,JPO |
---|