PRIORITY DYNAMIC CONTROL SYSTEM, PRIORITY DYNAMIC CONTROL METHOD, AND PRIORITY DYNAMIC CONTROL PROGRAM
PROBLEM TO BE SOLVED: To provide a priority dynamic control system reducing waste of resources and effectively using the resources. SOLUTION: This priority dynamic control system is characterized in determining priority of a job or a process according to a difference between resource application inf...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a priority dynamic control system reducing waste of resources and effectively using the resources. SOLUTION: This priority dynamic control system is characterized in determining priority of a job or a process according to a difference between resource application information of the job and practical use resource information and dynamically changing the priority of the job or the process. |
---|