SYSTEM FOR INTEGRATED CONTROL OF COMPUTERIZED CONSTRUCTION OF TUNNEL

PROBLEM TO BE SOLVED: To conduct a centralized control of information on a measuring control, a stability estimate, a cost management, facing state observation, etc., to display the actually necessary information regarding construction of a tunnel on a monitor, with selection and processing, and to...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: TSUJI MUNEKATSU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To conduct a centralized control of information on a measuring control, a stability estimate, a cost management, facing state observation, etc., to display the actually necessary information regarding construction of a tunnel on a monitor, with selection and processing, and to effectively attain cost reduction, improvement of productivity such as shortening of time for construction, improvement of safety and quality, etc. SOLUTION: The present system 1 for integrated control of computerized construction of the tunnel displays the information on the control of construction of the tunnel on the monitor on the basis of various information such as measured data, monitoring images and information on the construction which are sent from the inside of the tunnel. The system 1 has, on a monitor screen, at least a construction state information display part 2 which displays a state of progress of the construction of the tunnel, a facing image information display part 3 which displays the image of a facing, an inner displacement information display part 4 which displays the present measured values of inner displacement and the estimated amount of final displacement and a cost management information display part 5 which conducts a display of parameters of the actual results of construction and/or a display of cost indexes based on these parameters.