SYSTEM AND METHOD FOR MANAGING DELIVERY TIME

PROBLEM TO BE SOLVED: To provide a delivery time management system capable of surely and quickly performing delivery time management at a low cost. SOLUTION: This delivery time management system for performing delivery time management of products and/or drawing consists of a product/drawing manageme...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: MIZUMACHI YUICHIRO, YOKOI MIKI, YOKOSE KENJI, TATE HITOSHI, SAKAMOTO KEIJI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a delivery time management system capable of surely and quickly performing delivery time management at a low cost. SOLUTION: This delivery time management system for performing delivery time management of products and/or drawing consists of a product/drawing management database 1 for storing information for delivery time management and a management control device 2 connected to maker side terminals 6a and a user side terminal 8a and for performing delivery time on the basis of stored in the database 1, the database 1 stores information needed to calculate a penalty amount including a contractual drawing presentation limit, a product shipping limit, an amount of contract with a maker, and a penalty rate including drawing presentation delay and product shipping delay, and the management control means 2 calculates a penalty amount on the basis the information stored in the database 1 and notifies makers 6 of the number of delay days for product delivery or the number of delay days for drawing presentation and the penalty amount by the delay through the maker side terminals 6a.