TUNNEL CONSTRUCTION METHOD AND TUNNEL

PROBLEM TO BE SOLVED: To provide a tunnel construction method and tunnel which restricts the settlement of the leg portion of the tunnel. SOLUTION: By using a curved boring machine, a curved downward drilling 28-(n+1) is provided from a facing 25 to the natural ground 23 in non-drilled portion forwa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: AOYANAGI TAKAHIRO, HAGIWARA TOMOHISA, FUKUYA YOSHINORI, IWATA MITSUISA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To provide a tunnel construction method and tunnel which restricts the settlement of the leg portion of the tunnel. SOLUTION: By using a curved boring machine, a curved downward drilling 28-(n+1) is provided from a facing 25 to the natural ground 23 in non-drilled portion forward, and an injecting material is injected and a reinforcing work 29-(n+1) as a pile body is provided. Next, the natural ground 23 forward of the facing 25 is excavated by a distance L and a timbering work 27-(n+1) is provided at the upper portion of the reinforcing work 29-(n+1).