TUNNEL CONSTRUCTION METHOD AND TUNNEL
PROBLEM TO BE SOLVED: To provide a tunnel construction method and tunnel which restricts the settlement of the leg portion of the tunnel. SOLUTION: By using a curved boring machine, a curved downward drilling 28-(n+1) is provided from a facing 25 to the natural ground 23 in non-drilled portion forwa...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a tunnel construction method and tunnel which restricts the settlement of the leg portion of the tunnel. SOLUTION: By using a curved boring machine, a curved downward drilling 28-(n+1) is provided from a facing 25 to the natural ground 23 in non-drilled portion forward, and an injecting material is injected and a reinforcing work 29-(n+1) as a pile body is provided. Next, the natural ground 23 forward of the facing 25 is excavated by a distance L and a timbering work 27-(n+1) is provided at the upper portion of the reinforcing work 29-(n+1). |
---|