JOINT PIPE CUTOFF STRUCTURE AND CLEANING METHOD OF JOINT PIPE
PROBLEM TO BE SOLVED: To securely cutoff a joint pipe part and retain the joint function when steel pipe piles are connected together through a joint pipe. SOLUTION: A pair of joint pipes 2 formed of circular steel pipes of which the slit 2a is formed along the axial direction of the steel pipe pile...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To securely cutoff a joint pipe part and retain the joint function when steel pipe piles are connected together through a joint pipe. SOLUTION: A pair of joint pipes 2 formed of circular steel pipes of which the slit 2a is formed along the axial direction of the steel pipe pile 1 are provided in the opposite side of the external side face of the steel pipe pile 1. When a part of the joint pipe 2 are fitted to each other through the slit 2a to connect mutual steel pipe piles 1 together, a cutoff structure 10 having a cutoff plate 11 closing a gap brought along the slit 2a is formed along the slit end. |
---|