STEEL-FRAMED BRACE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To smoothly and positively replenish an adhesive in a steel-framed brace construction method of building a steel-framed brace in a vertical face formed by a column, a beam, a lateral sash bar, a floor, and the like constituting a skeleton of a concrete construction, and filling...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To smoothly and positively replenish an adhesive in a steel-framed brace construction method of building a steel-framed brace in a vertical face formed by a column, a beam, a lateral sash bar, a floor, and the like constituting a skeleton of a concrete construction, and filling an adhesive between the outer edge of the steel-framed brace and the skeleton to stick them. SOLUTION: A large number of air vent tubes 12 provided with storage parts on the tip side are arranged between the lateral outer edge part of a steel-framed brace 1 and the skeleton and fixed by seals 5, and the storage part is formed of a flat tank. |
---|