TUNNEL CONSTRUCTING METHOD AND TUNNEL
PROBLEM TO BE SOLVED: To provide a tunnel constructing method which reduces settlement of the ground surface at the time of excavation of a tunnel, and shortens a construction period, and to provide the tunnel per se. SOLUTION: Prior to construction of a tunnel, steel pipes 9 which are preliminary i...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a tunnel constructing method which reduces settlement of the ground surface at the time of excavation of a tunnel, and shortens a construction period, and to provide the tunnel per se. SOLUTION: Prior to construction of a tunnel, steel pipes 9 which are preliminary installed works are arranged between improvement bodies 5 which are constructed from the ground surface 1. Then, an upper half portion is excavated, and a timbering (steel timbering + shotcrete) 13 for the upper half portion is constructed. Thereafter, a lower half portion is excavated, and a timbering (steel timbering + shotcrete) 19 for the lower half portion is constructed. In this manner, the tunnel is constructed. |
---|