BUILDING STRUCTURE AND ITS EXECUTION METHOD

PROBLEM TO BE SOLVED: To omit a footing beam and a footing by directly connecting a column to a pile head and to shorten the term of works, reduce construction cost and lighten waste. SOLUTION: In the building structure 1 in which a column 4 as an upper structure is built by an infilled type steel-p...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TANAKA HATSUTARO, YAMAZAKI NOBORU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To omit a footing beam and a footing by directly connecting a column to a pile head and to shorten the term of works, reduce construction cost and lighten waste. SOLUTION: In the building structure 1 in which a column 4 as an upper structure is built by an infilled type steel-pipe concrete construction and a beam is built by steel-framed construction, a footing beam 2 and the column 4 are connected through a connecting structure 7 made of concrete under the state in which a pile main reinforcement 8 and a column main reinforcement 12 are overlapped.