BUILDING STRUCTURE AND ITS EXECUTION METHOD
PROBLEM TO BE SOLVED: To omit a footing beam and a footing by directly connecting a column to a pile head and to shorten the term of works, reduce construction cost and lighten waste. SOLUTION: In the building structure 1 in which a column 4 as an upper structure is built by an infilled type steel-p...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To omit a footing beam and a footing by directly connecting a column to a pile head and to shorten the term of works, reduce construction cost and lighten waste. SOLUTION: In the building structure 1 in which a column 4 as an upper structure is built by an infilled type steel-pipe concrete construction and a beam is built by steel-framed construction, a footing beam 2 and the column 4 are connected through a connecting structure 7 made of concrete under the state in which a pile main reinforcement 8 and a column main reinforcement 12 are overlapped. |
---|