PILE DRIVING WORK BARGE AND PILE DRIVING DEVICE
PROBLEM TO BE SOLVED: To provide a pile driving work barge capable of driving a pile tilted in any direction longitudinally or laterally against the bow direction with a hull kept in the fixed direction. SOLUTION: The pile driving device 6 of a pile driving work barge 1 is provided with a column fra...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a pile driving work barge capable of driving a pile tilted in any direction longitudinally or laterally against the bow direction with a hull kept in the fixed direction. SOLUTION: The pile driving device 6 of a pile driving work barge 1 is provided with a column frame 9 horizontally rotatably supported by the tip of a jib 4 erecting or prostrating the column frame 9, an upper leader support section 14 provided at the upper end of the column frame 9, a longitudinally expandable catch fork 18 rotatably supporting the lower end of the column frame 9, a driving means rotating the column frame 9, a pile driving leader 7 rockably supported on the upper leader support section 14 and supported on an expandable support arm 16 provided at the lower section of the column frame 9, and a pile driving hammer 8 provided at the upper section of the pile driving leader 7. The pile driving leader 7 can be tilted longitudinally in the bow direction and also can be tilted laterally to the bow direction. |
---|