SEGMENT AND TUNNEL LINING METHOD
PROBLEM TO BE SOLVED: To provide a segment and a tunnel lining method wherewith economy, labor-saving and safety in execution of work can be achieved. SOLUTION: Works for primary lining are executed with a plurality of steel segments 6 arranged at the inner circumference of a tunnel which is under c...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To provide a segment and a tunnel lining method wherewith economy, labor-saving and safety in execution of work can be achieved. SOLUTION: Works for primary lining are executed with a plurality of steel segments 6 arranged at the inner circumference of a tunnel which is under construction, and a plurality of reinforcing steel materials 11 are arranged at the inside of each of the steel segments 6 with concrete placed therein, and the inner circumference of the tunnel is lined with the secondary lining comprising of the reinforcing steel materials 11 and concrete. On this occasion, the reinforcing steel materials 11 are fixed temporarily at the inside of the steel segment 6, and the reinforcing steel materials 11 are separated from the steel segment 6 after the steel segment 6 is arranged at the inner circumference of the tunnel and arranged at specified positions. |
---|