METHOD AND DEVICE FOR CONTROLLING OPTIMUM OPERATION OF POWER PLANT
PROBLEM TO BE SOLVED: To improve operating efficiency as a whole power-plant by controlling each power generating element on the basis of optimum load distribution obtained by arithmetically operating an optimum schedule from a schedule control data and the model of the power-plant and the quantity...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To improve operating efficiency as a whole power-plant by controlling each power generating element on the basis of optimum load distribution obtained by arithmetically operating an optimum schedule from a schedule control data and the model of the power-plant and the quantity of the state of an input process. SOLUTION: In a scheduling system 130, scheduling is conducted so that the running cost of the power-plant during a specified period is minimized in consideration of the quantities of demands in future of steam and electricity. In an optimizing system 110, the demand and supply balances of steam and electricity are satisfied, and the economically optimum load distribution of a boiler and a turbine is calculated as the whole power-plant. In a multivariable control system 120, the load of the boiler and the turbine is taken into a multivariable control operation section 123, and set as the set values of control operation. In the multivariable control operation section 123, the quantities of the states of processes are taken in as a control variable, a disturbance variable and an operation variable, and multivariable control is conducted while using optimizing arithemetic results as set values. |
---|