TUNNEL LINING METHOD AND EXCAVATION METHOD

PROBLEM TO BE SOLVED: To save labor for works by shortening a construction period and reducing construction costs by decreasing the number of times of driving and pulling in tunnel lining works. SOLUTION: Prior to the tunnel excavation, in a tunnel lining method for building at least a pair of verti...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ISHIBASHI TADAYOSHI, NAKAJIMA SATOSHI, MOCHIZUKI YOSHIO, TABATA HARUMI, KOBAYASHI TOMOHIDE, OOBA MITSUAKI, SATO HARUO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:PROBLEM TO BE SOLVED: To save labor for works by shortening a construction period and reducing construction costs by decreasing the number of times of driving and pulling in tunnel lining works. SOLUTION: Prior to the tunnel excavation, in a tunnel lining method for building at least a pair of vertical lining slabs 3, 3 and an upper floor lining slab 10 to be connected to the upper portion of these vertical lining slabs 3, 3 for dividing the tunnel section inside the ground, a floor slab 7 having a width corresponding to the span at least between the vertical lining slab 3, 3 is used as the lining material for the upper floor lining slab 10.