TUNNEL LINING METHOD AND EXCAVATION METHOD
PROBLEM TO BE SOLVED: To save labor for works by shortening a construction period and reducing construction costs by decreasing the number of times of driving and pulling in tunnel lining works. SOLUTION: Prior to the tunnel excavation, in a tunnel lining method for building at least a pair of verti...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | PROBLEM TO BE SOLVED: To save labor for works by shortening a construction period and reducing construction costs by decreasing the number of times of driving and pulling in tunnel lining works. SOLUTION: Prior to the tunnel excavation, in a tunnel lining method for building at least a pair of vertical lining slabs 3, 3 and an upper floor lining slab 10 to be connected to the upper portion of these vertical lining slabs 3, 3 for dividing the tunnel section inside the ground, a floor slab 7 having a width corresponding to the span at least between the vertical lining slab 3, 3 is used as the lining material for the upper floor lining slab 10. |
---|