Reservoir turning bands simulation with distributed computing
Some implementations relate to a method for parallelizing, by a geological data system, operations of a geostatistical simulation for a well data set via a plurality of processing elements (PEs). The method may include determining a reservoir area for the well data set. The method may include determ...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Some implementations relate to a method for parallelizing, by a geological data system, operations of a geostatistical simulation for a well data set via a plurality of processing elements (PEs). The method may include determining a reservoir area for the well data set. The method may include determining a set of turning band lines for the reservoir area. The method may include dividing the reservoir area into a plurality of tiles, each tile including a respective subset of the set of turning band lines. The method may include assigning at least one of the tiles to each of the PEs. The method may include determining, in parallel for each tile, intermediate results with respect to each respective subset of turning band lines. The method may include aggregating the intermediate results to form a final result of the geostatistical simulation. |
---|