Check schedule determination

In a check schedule decision method, after simulating the production line to produce a time-varying number of in-process workpieces in a designated process unit, a check-available time period for the designated process unit is detected based on a comparison of the time-varying number of in-process w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TAKAKO SAKAKIBARA, YUKIHIRO MURAOKA, YOICHI TOGASHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:In a check schedule decision method, after simulating the production line to produce a time-varying number of in-process workpieces in a designated process unit, a check-available time period for the designated process unit is detected based on a comparison of the time-varying number of in-process workpieces to a predetermined level. Further, the production line is simulated under a constraint that the designated process unit is stopped operating during the check-available time period to produce a simulated output of the production line being simulated. When the simulated output is not smaller than a predetermined target figure, a check schedule of the designated process unit is decided within the check-available time period.