PROCEDIMIENTO PARA GARANTIZAR LA ACTIVACION DE UNA INTERFAZ V5
LA INVENCION SE RELACIONA CON UN PROCEDIMIENTO PARA GARANTIZAR LA ACTIVACION DE UNA INTERFAZ V5 ENTRE UNA CENTRALITA LOCAL Y UN NODO DE ACCESO. DE ACUERDO CON LA INVENCION, LA COMPROBACION DEL ESTADO OPERATIVO DE LOS ENLACES PRINCIPALES Y SECUNDARIOS SE INICIA SIMULTANEAMENTE TANTO EN EL LADO DE LA...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | spa |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | LA INVENCION SE RELACIONA CON UN PROCEDIMIENTO PARA GARANTIZAR LA ACTIVACION DE UNA INTERFAZ V5 ENTRE UNA CENTRALITA LOCAL Y UN NODO DE ACCESO. DE ACUERDO CON LA INVENCION, LA COMPROBACION DEL ESTADO OPERATIVO DE LOS ENLACES PRINCIPALES Y SECUNDARIOS SE INICIA SIMULTANEAMENTE TANTO EN EL LADO DE LA CENTRALITA LOCAL COMO EN EL DEL NODO DE ACCESO; SI SE RECIBE PRIMERO UNA CONFIRMACION QUE INDIQUE QUE EL ENLACE SECUNDARIO ES OPERATIVO, SE PASA DEL ENLACE PRINCIPAL AL SECUNDARIO DE ACUERDO CON LAS DEFINICIONES V5 Y SE UTILIZA EL NUEVO ENLACE PRINCIPAL PARA PROTEGER LA INTERFAZ V5 DURANTE SU PROCESO DE ACTIVACION. LA INVENCION POSIBILITA QUE SE EVITEN LAS INTERRUPCIONES INNECESARIAS EN LA ACTIVACION DURANTE EL PROCEDIMIENTO DE ACTIVACION DE LA INTERFAZ V5.
The present invention relates to a procedure for ensuring the activation of a V5 interface formed between a local exchange and an access node. According to the invention, the checking of the operational condition of the primary and secondary links is started simultaneously both on the local exchange side and on the access node side, and if a confirmation indicating that the link is operational is received for the secondary link first, then a switchover of the primary link to the secondary link according to the V5 definitions is performed and the new primary link is used for protection in the V5 interface during the V5 interface activation process. The invention makes it possible to avoid unnecessary interruptions of activation during the V5 interface activation procedure. |
---|