FACILITY DEVELOPMENT PLANNING AND COST ESTIMATION
A method includes receiving input data representing element-level parameters of a project, generating normalized data by normalizing the input data to a neutral reference plane, normalizing including normalizing the element-level parameters based on at least one of transport data, location data, ins...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre ; ger |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method includes receiving input data representing element-level parameters of a project, generating normalized data by normalizing the input data to a neutral reference plane, normalizing including normalizing the element-level parameters based on at least one of transport data, location data, installation data, or time data, adding the normalized data to a database of element-level parameter data, and adjusting one or more parameter curves using the database to which the normalized data was added. |
---|