TRAIN TRAFFIC CONTROL SYSTEM AND TRAIN TRAFFIC CONTROL METHOD

A train operation control system 100 includes: a headcount estimation device 2 that estimates the number of people in a train and the number of people on a platform 30 by using video data outputted from a plurality of on-board cameras 23 and a plurality of ground cameras 1; and a train rescheduling...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: TOKUMARU, Makoto
Format: Patent
Sprache:eng ; fre ; ger
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A train operation control system 100 includes: a headcount estimation device 2 that estimates the number of people in a train and the number of people on a platform 30 by using video data outputted from a plurality of on-board cameras 23 and a plurality of ground cameras 1; and a train rescheduling device 9 that predicts a dwell time required for passengers to board and detrain from the train using the estimated headcount information estimated by the headcount estimation device 2 and schedule information stored in an operation management device 8, and accordingly performs train operation rescheduling. The train operation control system can predict the dwell time accurately and accordingly perform train operation rescheduling even when the number of passengers fluctuates.