METHOD FOR DETERMINING A POSITION OF A WATER/CEMENT BOUNDARY BETWEEN PIPES IN A HYDROCARBON WELL
A method has been disclosed for determining a position of a water/cement boundary in an annular area between two concentric pipes in a hydrocarbon well. The method comprises the steps of running a well tool (10) into a central pipe of the well, where the well tool (10) comprises a tool housing (11),...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre ; ger |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method has been disclosed for determining a position of a water/cement boundary in an annular area between two concentric pipes in a hydrocarbon well. The method comprises the steps of running a well tool (10) into a central pipe of the well, where the well tool (10) comprises a tool housing (11), a pulse generator (14) and a signal recorder (16) provided within the housing (11); generating an electromagnetic pulse by means of the pulse generator, thereby providing physical vibrations in the central pipe of the well; recording reflected acoustic signals from the well by means of the signal recorder (16); repeating the generating and recording steps for different vertical positions of the pulse generator in the well; organizing the recorded signals in a two-dimensional representation; filtering the organized recorded signals in order to identify, in the two-dimensional representation, a hyperbola (B); and providing an apex of the hyperbola (B) as the determined position of the water/cement boundary. |
---|