Method For Controlling Gas Turbine Rotor Temperature During Periods Of Extended Downtime
A method for warming the rotor of a gas turbine during extended periods of downtime comprising feeding ambient air to an air blower; extracting compressed air from the air blower (103); feeding a portion of the compressed air (104) to one side of a heat exchanger (105) and feeding steam (114) (typic...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre ; ger |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method for warming the rotor of a gas turbine during extended periods of downtime comprising feeding ambient air to an air blower; extracting compressed air from the air blower (103); feeding a portion of the compressed air (104) to one side of a heat exchanger (105) and feeding steam (114) (typically saturated) from e.g. a gas turbine heat recovery steam generator, to the other side of the heat exchanger; passing the resulting heated air stream (108) from the exchanger into and through into defined flow channels formed within the rotor; continuously monitoring the air temperature inside the rotor; and controlling (109) the amount of air and steam fed to the heat exchanger (105) using a feedback control loop (113) that controls the amount of air and steam feeds to the exchanger and/or adjusts the flow rate of heated air stream into the rotor. |
---|