Enhanced plant level support of grid reconstruction

Methodology is provided for enhancing plant 200 level support for grid reconstruction following a blackout. A plant 200 based grid reconstruction manager develops solutions for reconstruction sequence steps to be carried out automatically or to be communicated to site personnel for manual implementa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Boes, Laura Lea, Long, Christopher Eugene
Format: Patent
Sprache:eng ; fre ; ger
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Methodology is provided for enhancing plant 200 level support for grid reconstruction following a blackout. A plant 200 based grid reconstruction manager develops solutions for reconstruction sequence steps to be carried out automatically or to be communicated to site personnel for manual implementation. The sequence steps are based on high-fidelity modeling of the capabilities all of the power production units present in a power plant 200 and take into consideration grid specified load expectations, ambient conditions including ambient temperature and gas turbine operating levels. The methodology also provides for consideration of possible subsequent steps in the sequence to maximize the ability to pick-up additional load in such subsequent steps.