Method for controlling seperable chemical processes according to a production plan
The method involves detecting and monitoring a measurement parameter dependent on an operating parameter of at least one of the stages (1-3). If the parameter exceeds a threshold value a signal is triggered that causes re-computation of the process plan, following which the processes are conducted a...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; fre ; ger |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The method involves detecting and monitoring a measurement parameter dependent on an operating parameter of at least one of the stages (1-3). If the parameter exceeds a threshold value a signal is triggered that causes re-computation of the process plan, following which the processes are conducted according to the new plan. |
---|