Fremgangsmåde til nedlæggelse af affaldspladser og deponering af kommunalt og/eller industrielt affaldsmateriale i betonsiloer

Method of removal of open landfills and storage of the municipal and industrial waste materials by storing them in concrete silos which are erected directly on the existing landfill. The silo is constructed by ring-shaping stages, carrying out first excavation and then in cycles subsequent excavatio...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: DOBRZANSKI, HENRYK, DOBRZANSKI, PRZEMYSLAW, DOBRZANSKI, ANDRZEJ, RZEPKA, JERZY
Format: Patent
Sprache:dan
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:Method of removal of open landfills and storage of the municipal and industrial waste materials by storing them in concrete silos which are erected directly on the existing landfill. The silo is constructed by ring-shaping stages, carrying out first excavation and then in cycles subsequent excavations having depth of 1,5 - 2,0 m whereby the clean soil is put aside. After execution of the ring-shaped concrete silo walls, the insulation is fastened on the surfaces of the silo. Then a thick-plastic concrete is poured forming the bottom of the silo. Then the wastes together with polluted soil removed from adjacent area are relocated into the silo. A concrete cover in form of flat dome is carried out, this cover being additionally protected using insulating foil. The filled and effectively closed silo is covered by putting several layers of unpolluted soil gained from excavation.