DE4107678
The measuring point (7) on the drill head (5) is located precisely opposite the ridge of the annular tooth (3), where magnetometers (9) are fitted and wired to a processor (8). The rotational speed is signalled by the passage of one or more magnetised balls, or rollers, in the bearing (10) of the to...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The measuring point (7) on the drill head (5) is located precisely opposite the ridge of the annular tooth (3), where magnetometers (9) are fitted and wired to a processor (8). The rotational speed is signalled by the passage of one or more magnetised balls, or rollers, in the bearing (10) of the tool holder (4). The overroll signals from a new tooth, a worn one, and a blocked or stationary one are readily distinguishable in continuous monitoring and processing. USE/ADVANTAGE - For roller boring tools, with simple and reliable monitoring. |
---|