VERFAHREN ZUM BRUCHBAU VON MAECHTIGEN KOHLENFLOEZEN IN MINDESTENS ZWEI BAENKEN UND VERFESTIGUNGSLOESUNG ZU DESSEN DURCHFUEHRUNG
In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench,...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | ger |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | In mining a heavy coal seam that must be excavated in several benches, the excavation of the uppermost bench is accompanied by the introduction of a cementitious slurry into the resulting stope for consolidating the waste rock present therein, preparatorily to the excavation of the next-lower bench, and proceeding in like manner with the second bench if a third one is to follow. The cementitious slurry comprises burnt or slaked lime, and/or portland cement, suspended in water in a quantity of about 10 to 60% by weight and preferably together with a small percentage of chlorides of one or more alkali or alkaline-earth metals, to which ceramic aggregates at large specific surface such as mineral ashes, slag, sand or dolomite powder may be added in a quantity of up to about 30% of the weight of the water. The slurry, on being admitted to the stope in an amount of at least 10% of the volume thereof, causes the waste rock to swell and to form a solid layer of up to approximately a meter in thickness which allows the next-lower bench to be excavated after only about a month's delay. |
---|