VERFAHREN ZUM BAU VON WOHNRAEUMEN,INSBESONDERE FUER SCHIFFE,SOWIE MIT DIESEM VERFAHREN HERGESTELLTE WOHNRAEUME

The process is based on the fact that the place between the decks which is intended for the spaces is split up by means of optical methods into its parts in proportions which come to an integral multiple of the selected and adopted module, the nodal and limit points of these parts being permanently...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LISOWSKI,LECH,PL, KOWALSKI,MICHAL,PL, WIERZBICKI,ZBIGNIEW,PL, BIALY,MIKOLAY,PL, KEMPKIEWICZ,ZBIGNIEW,PL, CHUDZICKI,KAZIMIERZ,PL, GRZYBOWSKI,FLORIAN,PL, FIGURSKI,MARCELI,PL, WOLKONSKI,JANUSZ,PL, ANOSOWICZ,ZBIGNIEW,PL, KISER,JERZY,PL
Format: Patent
Sprache:ger
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The process is based on the fact that the place between the decks which is intended for the spaces is split up by means of optical methods into its parts in proportions which come to an integral multiple of the selected and adopted module, the nodal and limit points of these parts being permanently designated by means of stud bolts (5) and suspension means (30) which are welded to the lower deck (1) and upper deck (2). Furthermore, established in the base area is the position of the lower frame and, in relation to it, the position of the upper frame (14) in the region of which the ceiling framework (28) is created. The wall areas are filled with wall panels (19) and the ceiling framework with ceiling panels (32). Finally, the floor is laid on the lower deck (1). These living spaces are characterised in that the lower frame is connected to a frame of vertical supports, and the deck hangs freely on suspension means (36) and is elastically connected to the wall area by wall covering strips (29).