Integral jacking, dismantling, transporting and installing device for nuclear power temporary transfer platform

The utility model is suitable for the technical improvement field of large transportation equipment, and provides an integral jacking, dismantling, transporting and installing device for a nuclear power temporary transfer platform, which comprises a self-propelled module transport vehicle, a bearing...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHANG WEIYE, ZHANG JINDING, XIE WEIJIN, HUANG YINGQIANG, ZHANG LINHUI, HUANG SHAOHENG, ZENG XIAOLONG, CHEN ZIMING, LI WANNENG, ZHAO MIN, XIAO KAI, LIANG RUFU, HUANG RUI, FEI MIN, YU SHENGCHAO, YANG JINCHENG, FENG XIAOBIN, LIU YU, CHEN ZEHONG, ZHANG HONGYE, JI WENBAO, WU LI, PAN GUOLING, WANG YELUO, FENG XUANSHUN, NIE YAN, FENG MAOLONG, ZHONG HAITAO, ZHAO ZHIANG, ZHAO YUANKAI, LIANG PENGWEI, SU BIN, LIU JINYAN
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model is suitable for the technical improvement field of large transportation equipment, and provides an integral jacking, dismantling, transporting and installing device for a nuclear power temporary transfer platform, which comprises a self-propelled module transport vehicle, a bearing stand column, a bearing beam and a limiting device, the bearing beam is installed on the bearing stand column, and the limiting device is installed on the bearing stand column. The problem that the working period is long when a temporary transfer platform is disassembled, transferred and reinstalled is solved, and the construction efficiency can be effectively improved. 本实用新型适用于大型运输设备技术改进领域,提供了核电临时转运平台整体顶升拆除运输与安装装置,包括自行式模块运输车、承载立柱、承载梁及限位装置,所述承载立柱安装于所述自行式模块运输车上,所述承载梁安装于所述承载立柱上,所述限位装置安装于所述承载上。解决了因临时转运平台拆解转场重新安装的工作工期较长的问题,能有效提高施工效率。