Landslide monitoring and early warning equipment
According to the scheme, the landslide monitoring and early warning equipment comprises a base mark, a precast pile with a circular section and a platform used for installing a solar panel of a solar power generation system. The side of the top of the grouting sleeve is provided with a grouting open...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | According to the scheme, the landslide monitoring and early warning equipment comprises a base mark, a precast pile with a circular section and a platform used for installing a solar panel of a solar power generation system. The side of the top of the grouting sleeve is provided with a grouting opening for high-pressure grouting, a double-layer tank is adopted, sleeve supports are arranged in an inner pipe and an outer pipe in a staggered mode, and the inner pipe and the outer pipe are vertically communicated; the top of the grouting sleeve is provided with a fixed water stop gasket and a pulley-fixed integrated ring, and the bottom of the outer pipe is provided with a grouting hole; the monitoring ball is divided into an inner part and an outer part; a triggering device; the alarm is located in the stainless steel square box and is also provided with conductive metal, and the two conductive metal are in contact fit to trigger the alarm to give an alarm; the connecting rod is a reinforced concrete rod with a |
---|