Anchor rod construction auxiliary device

The anchor rod construction auxiliary device comprises a main rod, a plurality of holding rods are arranged on the main rod and arranged at intervals in the axial direction of the main rod, and the axial direction of the holding rods is perpendicular to the axial direction of the main rod; the two e...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: ZHU HONGJIN, DU ZEDONG, LIU HUABIAO
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The anchor rod construction auxiliary device comprises a main rod, a plurality of holding rods are arranged on the main rod and arranged at intervals in the axial direction of the main rod, and the axial direction of the holding rods is perpendicular to the axial direction of the main rod; the two ends of the main rod are each provided with a first counter bore used for sleeving an anchor rod. During anchor rod imbedding construction, the anchor rod is inserted into the first counter bore in one end of the main rod, a plurality of persons hold the holding rod to exert force cooperatively to imbedding the anchor rod, and the operation process is convenient and fast. Therefore, according to the construction auxiliary device, due to the fact that the anchor rod is inserted into the first counter bore of the main rod when the anchor rod is placed in, the first counter bore can effectively prevent the anchor rod from bending and deforming. In addition, when multiple persons cooperate for boosting, the user can hol