Electric well PC finished product embedded part with bridge
The utility model discloses an electric well PC finished product embedded part with a bridge frame. The electric well PC finished product embedded part comprises a bridge frame finished product embedded section and a water retaining reverse ridge finished product embedded section. The electric well...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses an electric well PC finished product embedded part with a bridge frame. The electric well PC finished product embedded part comprises a bridge frame finished product embedded section and a water retaining reverse ridge finished product embedded section. The electric well bridge construction structure is reasonable in structure, the bridge finished product pre-embedded section is used for replacing a traditional electric well bridge construction pre-reserved hole, the problems that in the bridge construction process, the hole is reserved firstly, plain mud concrete is poured into the water retaining reverse ridge finished product pre-embedded section, the phenomenon that in the later period, a formwork is erected again for pouring concrete on a bridge water retaining ridge platform is avoided, the construction procedure is reduced, and the construction efficiency is improved. And construction resources in the bridge construction process are saved, the working efficiency is improved, |
---|