Full-section bolting and grouting high-pre-tightening supporting device and system for extremely broken soft rock roadway
The utility model discloses a full-section bolting and grouting high pre-tightening supporting device and system for an extremely broken soft rock roadway, which belongs to the field of underground supporting and comprises a composite roadway layer, and the composite roadway layer comprises a shallo...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a full-section bolting and grouting high pre-tightening supporting device and system for an extremely broken soft rock roadway, which belongs to the field of underground supporting and comprises a composite roadway layer, and the composite roadway layer comprises a shallow grout stopping layer and a terrace which are sequentially constructed on the surface of roadway surrounding rock; a plurality of bolting and grouting high-pre-tightening supporting anchor rods are arranged on the composite roadway layer at equal intervals; the bolting and grouting high pre-tightening support comprises a large-diameter sleeve anchor cable arranged in the composite roadway, the middle section of the large-diameter anchor cable is sleeved with a plastic sleeve, a gap is reserved between the inner hole wall of the plastic sleeve and the outer wall of the large-diameter anchor cable to form a large-diameter anchor cable free section, and threads are arranged on the tail section of the large-diameter a |
---|