Temporary support fixing construction structure for welding of high hollow pipe frame
The utility model discloses a temporary support fixing construction structure for welding of a high-altitude pipe frame. The temporary support fixing construction structure comprises a concrete frame; the pipeline is located in the concrete frame; the supporting strip is mounted at the top of the su...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a temporary support fixing construction structure for welding of a high-altitude pipe frame. The temporary support fixing construction structure comprises a concrete frame; the pipeline is located in the concrete frame; the supporting strip is mounted at the top of the supporting frame body and is in close contact with the supporting pipeline. After the two spaced supporting strips at the top of the supporting frame body support the pipeline, the pipeline is temporarily supported and fixedly placed on the concrete frame, and the pipeline can be supported in the concrete frame without occupying hoisting equipment, so that the hoisting equipment can conveniently carry out follow-up operation to improve the follow-up construction efficiency; the problem that the pipeline can only be supported in a concrete frame by occupying hoisting equipment is solved.
本申请公开了一种高空管架焊接临时支架固定施工结构,包括:混凝土架;管道,管道处于混凝土架内;支撑架体及安装在支撑架体顶部的支撑条,支撑条紧密接触支撑管道。支撑架体顶部两个间隔的支撑条对管道支撑后,使管道获得临时支撑固定放置在混凝土架上,不会占用吊装设备才能获得支撑 |
---|