Concrete pouring equipment for bridge body construction

The utility model relates to the field of bridge body construction, in particular to concrete pouring equipment for bridge body construction. Comprising a first base, two sets of first supporting columns are symmetrically installed at the edge of the bottom of the first base, a set of first universa...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: LUO XINGLIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model relates to the field of bridge body construction, in particular to concrete pouring equipment for bridge body construction. Comprising a first base, two sets of first supporting columns are symmetrically installed at the edge of the bottom of the first base, a set of first universal wheels is installed at the bottom of each set of first supporting columns, a feeding assembly is installed at the top of the first base, and a second base is connected between one set of first supporting columns; two sets of second supporting columns are symmetrically installed on the edge of the bottom of the second base, a set of second universal wheels is installed at the bottom of each set of second supporting columns, and a first fixing block is installed at the top of the second base; according to the embodiment, the problem that pouring equipment cannot adjust the height and angle of the position where the conveying pipe is located according to different construction positions of a bridge body to be poured