Steel beam pushing and dragging steel strand erecting system

The utility model discloses a steel strand erecting system for pushing and dragging a steel beam. The steel strand erecting system aims at effectively avoiding scraping damage to a pier column in the erecting process of dragging the steel strand. Therefore, the steel strand erecting system comprises...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: CHENG HONGKAI, LIU TIANBING, ZHANG CHONGZHENG, TANG TAO, LI LI, ZHENG XIANTAO, LU DAIZHOU, RAN FEIYAO, LEI NIAN, ZHANG YANGHUA, LI WEI, HOU YUNJIANG, WANG CHENGHAO, LIU LONG, ZHAO MINGFU, QU XINWEI, WANG HUAN, WANG CHAOJIANG
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses a steel strand erecting system for pushing and dragging a steel beam. The steel strand erecting system aims at effectively avoiding scraping damage to a pier column in the erecting process of dragging the steel strand. Therefore, the steel strand erecting system comprises an erecting antenna which is obliquely erected above a bridge in the longitudinal direction of the bridge and is high in front and low in rear, a hanging pulley which is installed on the erecting antenna in a sliding mode, and a driving mechanism which drives the hanging pulley to move back and forth along the erecting antenna. Wherein the two ends of the erected antenna are fixed to a pushing jack fixing pier at the front end of a bridge and a steel beam splicing platform at the rear end of the bridge respectively, and a dragging steel strand of the steel beam pushing and dragging system is fixedly connected to the hanging pulley. 本实用新型公开了一种钢梁顶推拖拉钢绞线架设系统,旨在有效避免拖拉钢绞线架设过程中与墩柱产生刮擦损伤。为此,本实用新型提供的钢梁顶推拖拉钢绞线架设系统,包括沿桥梁纵向前