Detachable double-hoop construction operation platform
The utility model provides a detachable double-hoop construction operation platform, which is characterized in that an upper construction operation platform is positioned in front of an upper hoop of double hoops adopted in overhead bridge engineering pier top cap construction through a left connect...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a detachable double-hoop construction operation platform, which is characterized in that an upper construction operation platform is positioned in front of an upper hoop of double hoops adopted in overhead bridge engineering pier top cap construction through a left connecting plate and a right connecting plate of the upper construction operation platform and is connected with the upper hoop; a lower construction operation platform is located in front of a lower hoop in the double hoops through a left connecting plate and a right connecting plate of the lower construction operation platform and connected with the lower hoop, the upper end of a vertical rod is arranged between the left connecting plate and the right connecting plate, the left connecting plate, the upper end of the vertical rod and the right connecting plate are fastened through a first fastener, and a panel is laid on the horizontal frame body. The insertion legs of the guardrail are inserted into the vertical inserti |
---|