Gasification furnace waste boiler sleeving equipment
The utility model provides a gasification furnace waste boiler set device which comprises guide rails (1) and a guide frame (2), the number of the guide rails (1) is not less than three, and the guide rails (1) are all arranged on the outer wall of an inner piece of a gasification furnace waste boil...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides a gasification furnace waste boiler set device which comprises guide rails (1) and a guide frame (2), the number of the guide rails (1) is not less than three, and the guide rails (1) are all arranged on the outer wall of an inner piece of a gasification furnace waste boiler. The number of the guide frames (2) is not less than three, and the guide frames (2) are arranged on the inner side of a shell of the waste boiler of the gasification furnace; the cross section of the guide rail (1) is I-shaped, and the guide frame (2) can be matched with the guide rail (1). The waste boiler of the gasification furnace can be horizontally mounted, the mounting cost is low, the sleeving speed is high, the structural stability is high, and the requirement for the number and skills of operators is lower.
本实用新型提供一种汽化炉废锅套装设备,该汽化炉废锅套装设备包括导轨(1)和导向架(2),其中所述导轨(1)的数量不少于三个,均设置在汽化炉废锅的内件的外壁上;所述导向架(2)的数量不少于三个,均设置在汽化炉废锅的壳体的内侧;所述导轨(1)的横截面为工字形,所述导向架(2)能与导轨(1)相配合。本实用新型能够卧装汽化炉废锅,安装成本低廉,套装速度快,结构稳定性高,对操作人员的数量和技能需要更少 |
---|