Construction hanging basket for aloft work

The construction hanging basket comprises a platform, side guardrails are fixedly installed on the width edges of the two sides of the top of the platform, a rear guardrail and a front guardrail are fixedly installed on the length edges of the two sides of the top of the platform respectively, and t...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: ZHU LONGHU
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!