Construction hanging basket for aloft work
The construction hanging basket comprises a platform, side guardrails are fixedly installed on the width edges of the two sides of the top of the platform, a rear guardrail and a front guardrail are fixedly installed on the length edges of the two sides of the top of the platform respectively, and t...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The construction hanging basket comprises a platform, side guardrails are fixedly installed on the width edges of the two sides of the top of the platform, a rear guardrail and a front guardrail are fixedly installed on the length edges of the two sides of the top of the platform respectively, and the front guardrail is composed of a plurality of guardrail units. Each guardrail unit comprises a lifting mechanism and a plurality of vertical pipes fixedly connected with the top of the platform, and inner rods are arranged at openings in the top ends of the vertical pipes in a penetrating mode; according to the hanging basket, when users of different heights use the hanging basket, the driving rod can be rotated through the hand wheel, so that the rotating shaft is driven to rotate through meshing of the worm part and the worm wheel, then the inner rod moves up and down along the vertical pipe through meshing of the gear and the rack, the height of the protection beam is adjusted, and therefore the height of the |
---|