Novel movable gauge pile tool for construction site

The utility model relates to the field of scaffold supporting column fixing, in particular to a novel movable positioning pile tool on a construction site, which comprises a fixing pipe, a first fixing plate, a second fixing plate and a third fixing plate, an inner cavity of the fixing pipe is used...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: LING WENZHI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model relates to the field of scaffold supporting column fixing, in particular to a novel movable positioning pile tool on a construction site, which comprises a fixing pipe, a first fixing plate, a second fixing plate and a third fixing plate, an inner cavity of the fixing pipe is used for being inserted and matched with a supporting column of a scaffold, and the fixing pipe is vertically mounted on the first fixing plate; a fixing bolt is vertically arranged on the first fixing plate in a penetrating mode, the fixing bolt is arranged close to the end of the first fixing plate, the second fixing plate is in threaded fit with the fixing bolt, the second fixing plate is arranged far away from the fixing pipe, and the third fixing plate is fixedly arranged on the side, far away from the fixing pipe, of the first fixing plate. And the third fixing plate is used for positioning the first fixing plate which is fixedly arranged on the I-shaped steel. The fixing device has the effects of reducing damage