Assembled mold box for pouring protection wall of lightning rod of booster station
The utility model provides an assembled mould box for pouring a protection wall of a lightning rod of a booster station. The assembled mould box comprises two half steel semi-cylindrical mould boxes which are sleeved outside the lightning rod, and a plurality of wedge-shaped battens are arranged bet...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model provides an assembled mould box for pouring a protection wall of a lightning rod of a booster station. The assembled mould box comprises two half steel semi-cylindrical mould boxes which are sleeved outside the lightning rod, and a plurality of wedge-shaped battens are arranged between the two halves of steel semi-cylindrical mold boxes and the lightning rod. The problems that traditional woodworking formwork erecting speed is low, a cylindrical wood formwork box is not prone to formwork erecting, repeated use is difficult, and construction cost is high are solved. The assembled pouring mold box is used, rapid mold erecting is achieved, mounting and dismounting are easy, repeated use can be achieved, and the construction cost is reduced.
本实用新型提供了一种用于浇筑升压站避雷针护壁的组装式模盒,包括套接在避雷针外的两半钢制半圆柱形模盒;在两半钢制半圆柱形模盒与避雷针之间设有多个楔形木方。本实用新型克服了传统木工支模速度慢,圆柱形木模盒不易支模,难以重复使用,施工成本高的问题;使用组装式的浇筑模盒,实现快速支模,安装、拆除容易,能重复使用,降低施工成本。 |
---|