Emergency braking system for big arm during power failure of tower crane
The utility model relates to a tower crane power failure big arm emergency braking system which comprises a base, a tower crane body is arranged at the upper end of the base, a charger is fixedly installed at the upper end of the base, a battery pack is fixedly installed at the upper end of the base...
Gespeichert in:
Hauptverfasser: | , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model relates to a tower crane power failure big arm emergency braking system which comprises a base, a tower crane body is arranged at the upper end of the base, a charger is fixedly installed at the upper end of the base, a battery pack is fixedly installed at the upper end of the base, and the output end of the battery pack is electrically connected with a bridge rectifier circuit. The bridge type rectification circuit is electrically connected with a rotation braking control switch, a direct current V alternating current contactor, a rotation braking electromagnet coil and a V alternating current contactor, and the rotation braking control switch, the direct current V alternating current contactor, the rotation braking electromagnet coil and the V alternating current contactor are electrically connected to the bridge type rectification circuit. According to the emergency braking system for the power-off big arm of the tower crane, the big arm of the tower crane can be effectively controlled to |
---|