Filler taking-out device of gas cooling tower
The utility model discloses a gas cooling tower filler taking-out device which comprises a lower manhole, a belt conveyor, a funnel and a funnel support, a fixed filler supporting plate and a movable filler supporting plate are arranged at the bottom of a filler section in a tower, the bottom of the...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a gas cooling tower filler taking-out device which comprises a lower manhole, a belt conveyor, a funnel and a funnel support, a fixed filler supporting plate and a movable filler supporting plate are arranged at the bottom of a filler section in a tower, the bottom of the fixed filler supporting plate is supported by a fixed supporting beam, and the movable filler supporting plate is supported by a movable supporting beam. The fixed supporting beam is fixedly connected with the inner wall of the gas cooling tower, the two ends of the movable supporting beam are connected with the fixed supporting beam through flanges, the funnel is located below the movable supporting beam and fixed in the gas cooling tower through the funnel support, one end of the belt conveyor is located in the funnel support, and the other end of the belt conveyor penetrates through a lower manhole to be located outside the gas cooling tower. The falling amount of the plastic filler in unit time is adjusted by |
---|