Split starting assembly pipe piece feeding device
The utility model discloses a split starting assembled duct piece feeding device which comprises a tunnel and a shield body, a track is laid on the lower portion in the tunnel, and a trolley matched with the track is arranged on the top of the track. One end of the track extends into the shield body...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a split starting assembled duct piece feeding device which comprises a tunnel and a shield body, a track is laid on the lower portion in the tunnel, and a trolley matched with the track is arranged on the top of the track. One end of the track extends into the shield body, and a segment erector is mounted on the side, close to the trolley, in the shield body; a segment crane is mounted between the trolley and the segment erector; a duct piece feeding assembly is installed above the track and located between the duct piece crane and the duct piece erector. According to the utility model, the duct piece feeding assembly is matched with the winch motor, so that the transportation time from the duct piece trolley to the duct piece erector for assembling duct pieces is shortened; the problem that after a segment crane unloads segments from a segment trolley, a segment erector moves to the maximum limit and cannot grab and lift the segments is solved, and the procedure connection from se |
---|