Auxiliary construction tool for electric power overhaul construction

The utility model discloses an auxiliary construction tool for electric power overhaul construction, and relates to the technical field of electric power overhaul construction. The device comprises a bearing frame which is placed on the ground and is used for mounting and bearing an external structu...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: WANG SHANSHAN, CAO ZHEN, LUO YI, CHEN HAO, SHI ZHANGYAN, CHEN JUNJIE, ZHOU KAITIAN, ZHOU WEI, PAN BAOBAO, HAO SHUYI
Format: Patent
Sprache:chi ; eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:The utility model discloses an auxiliary construction tool for electric power overhaul construction, and relates to the technical field of electric power overhaul construction. The device comprises a bearing frame which is placed on the ground and is used for mounting and bearing an external structure; the auxiliary construction mechanism is connected to the bearing frame and is used for assisting electric power overhaul; the auxiliary construction mechanism comprises a set of tool containing pieces symmetrically connected to the inner end of the bearing frame, a mounting piece connected to the center of the upper end of the bearing frame and a collecting and releasing piece connected to the inner side of the mounting piece. By arranging the auxiliary construction mechanism, the problems that in the maintenance process of an existing cable, winding and unwinding operation of a new cable in replacement is generally carried out through a winding and unwinding frame so as to assist maintenance, but after the win