Four-line parallel large-span subway tunnel excavation construction monitoring structure
The utility model discloses a four-line parallel large-span subway tunnel excavation construction monitoring structure, which relates to the field of tunnel construction, and comprises a first water level hole, a second water level hole, a first soil body layering vertical displacement monitor and a...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | chi ; eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | The utility model discloses a four-line parallel large-span subway tunnel excavation construction monitoring structure, which relates to the field of tunnel construction, and comprises a first water level hole, a second water level hole, a first soil body layering vertical displacement monitor and a second soil body layering vertical displacement monitor, and a pipeline is embedded between the first water level hole and the first soil body layering vertical displacement monitor; a ground surface settlement monitoring point is arranged on the tunnel center line, a pilot tunnel is arranged below the tunnel center line, a vault settlement monitoring point is arranged at the vault position of the pilot tunnel, and the ground surface settlement monitoring point and the vault settlement monitoring point are arranged on the same section; middle partition wall vertical displacement monitoring points are arranged on a middle partition wall of the pilot tunnel, and a pipe piece structure is further arranged at the lowe |
---|